Skip to content

Gazelle Hat Factory · China OEM/ODM · Since 1979

Built for your brand.Made to be worn.

Custom headwear and apparel, developed and produced to your approved specification across our wholly owned factories.

3
wholly owned factories
10M+
pcs annual capacity
50+
countries served

Certified & audited by

BSCISocial Audit
SEDEX SMETAAudited
Disney FAMAApproved
NBCUniversalLicensed & Approved
GRSRecycled
HIGGFacility Assessment
Better WorkWorkplace Standards
47+
Years OEM Experience
200+
Global Brand Clients
10M+
Annual Capacity (pcs)
50+
Countries Served
The 65-metre hat-shaped landmark in Shipai, Dongguan

DONGGUAN · CHINA

A 65-metre hat. A lifetime in headwear.

Built by a family that has spent decades in caps — and a belief that a factory should give something back to its city.

Read the story →

THE FLOORS BEHIND THE SAMPLE

Inside the factory

Real departments, real equipment: cutting, embroidery, inspection and the Dongguan showroom.

See the factory →
03

Buying paths

Start with the question you are trying to answer.

Buyer questions
04

Buyer questions

What is the minimum order?

Most caps start at about 100 pieces per style and colour. The final MOQ is confirmed against your artwork, decoration, fabric and packaging.

Can we approve a sample before bulk?

Yes. We make a production sample in the bulk materials for written approval, and bulk production starts only after the sample and specification are signed off.

Where are your factories?

Our wholly owned factories are in Dongguan (Guangdong) and Suzhou (Anhui), China, and Phnom Penh, Cambodia.

06

Buyer answers

Direct answers on MOQ, samples, lead time, audits and documents.

All buyer answers →

Cap MOQ

What is the MOQ for custom caps?

For custom caps, a practical production MOQ commonly starts around 100 pieces per style and colour. The final MOQ is confirmed after artwork, fabric, decoration, labels and packaging are reviewed.

Sample approval

How does custom cap sample approval work?

A physical pre-production sample is made in the bulk materials so you can approve fit, colour, decoration and finishing. Bulk production starts only after the sample and specification are signed off in writing.

Lead time

How long does custom cap production take?

There is no single lead time for custom caps. The schedule depends on construction, fabric, decoration, quantity, sample approval, inspection and transit. It is confirmed for the actual order, not promised as a generic number.

Factory audit

What should a buyer check in a cap factory audit?

Check ownership and the actual production site, follow one order from cutting to packing, review inspection and correction records, inspect the sample room, and interview workers. A certificate is useful only when its scope matches the product and site.

Fabric & decoration

Which fabric and decoration should I choose for custom caps?

Choose fabric by use, hand-feel, durability and target cost, then choose decoration by artwork, surface and wash requirements. There is no universal best combination; request swatches and a physical sample before bulk.

Import documents

What documents do I need to import custom caps?

Typical documents include a commercial invoice, packing list, transport document, HS code and origin information, plus any labels or test documents required for the actual product and destination. Incoterms and duty treatment are confirmed for each shipment.

// WHAT WE DO

Six capabilities.
One factory.

Custom Design

Custom Design

Material Sourcing

Material Sourcing

Sample in 3–7 Days

Sample in 3–7 Days

AQL 2.5 QC

AQL 2.5 QC

Flexible MOQ

Flexible MOQ

Global Shipping

Global Shipping

// HOW WE WORK

From inquiry to delivery.

Process →
Specification01

Specification

Sample02

Sample

Approval03

Approval

Production04

Production

Inspection05

Inspection

Delivery06

Delivery

Compliance & Documentation

Gazelle · QC

Compliance & Documentation

Order Requirements
Material Documents
Sample Approval
Production Inspection
Product Testing
Direct Factories
Quality & compliance →
Direct Manufacturing

// 1979 → 2026

Forty-seven years.
Three factories. Every stitch.

1979
Established
2026
Direct Manufacturing
Inquiry